Lesson 9: Construction Begins - Safe Practices and Documentation
Date: October 2, 2025
Session Time: 8:00am-12:00pm EST
Duration: 4 hours (including 15-minute exercise)
Key Learning Objective
Implementing safe construction practices and establishing systematic documentation protocols for project progress tracking.
Lesson Overview
This session marks the transition from planning to execution, focusing on safety protocols, proper tool usage, and establishing documentation systems for the construction phase.
Main Activities (3 hours 45 minutes)
- Safety equipment demonstration and fitting
- Tool safety and proper usage techniques
- Construction sequence planning and execution
- Photo and journal documentation setup
- Quality control and inspection procedures
15-Minute Exercise: Safety Setup and Documentation Start
Exercise Description
Set up a safe work area for a small construction task and begin the photo/journal documentation system that will be used throughout the project.
Materials Needed
- Safety equipment (gloves, safety glasses, hard hat if available)
- Camera or phone camera
- Notebook or digital document
- Basic tools (hammer, measuring tape, level)
- Work area markers or cones
Exercise Steps (15 minutes)
- Safety Area Setup (5 minutes)
- Identify and mark a 10' x 10' work area
- Set up safety barriers or markers
- Check for potential hazards (overhead, ground, weather)
- Ensure proper lighting and ventilation
-
Don appropriate safety equipment
-
Tool Safety Check (3 minutes)
- Inspect tools for damage or wear
- Verify proper tool operation
- Check that safety guards are in place
-
Note any tools that need maintenance or replacement
-
Documentation System Setup (4 minutes)
- Create a photo log template with date, time, description
- Take 3 "before" photos of the work area
- Start a journal entry with today's date and weather conditions
-
Note any initial observations or concerns
-
Quality Control Plan (3 minutes)
- List 3 quality checkpoints for today's work
- Identify who will perform each check
- Note any specific measurements or standards to verify
- Plan how to document any issues found
Deliverable
- Safety area setup checklist
- Tool inspection report
- 3 "before" photos with descriptions
- Initial journal entry
- Quality control checklist
Success Criteria
- Work area is clearly marked and safe
- All tools are inspected and functional
- Photos clearly show starting conditions
- Journal entry includes relevant details
- Quality control plan is specific and actionable
Integration with Overall Project
This exercise establishes the safety and documentation foundation that will be maintained throughout the entire construction process, ensuring consistent quality and safety standards.
Previous Session: Lesson 8: Procurement
Next Session: Lesson 10: Progress Tracking