FRS 16 Hull Build: Progress Update
Student: John Hurff Project: Scoughxxuene 2.0 Hull Build Semester: Fall 2026
This document tracks milestone completion across all six build phases. Update after each phase checkpoint.
Overall Build Status
Current Phase: Pre-Build (Not started) Sessions Completed: 0 of 18 Hull Completion: 0% Final Report: Not started
Phase Completion Tracker
Phase 1: Setup & Planning
Target: August 20, 2026 | Status: Not started
- [ ] Safety orientation complete
- [ ] Workspace set up and organized
- [ ] Kit inventoried and all panels labeled
- [ ] Photo catalog of all kit components complete
- [ ] Customization design sketch finalized
- [ ] Material procurement list complete
- [ ] All materials ordered or confirmed on hand
- [ ] Journal entries 1–3 submitted
Phase 1 Grade (Build Quality checkpoint): —
Phase 2: Stitching
Target: September 10, 2026 | Status: Not started
- [ ] Building supports set up
- [ ] All panels dry-fit and alignment verified
- [ ] Stitch holes drilled along all seams
- [ ] Hull bottom stitched
- [ ] Port and starboard sides stitched
- [ ] Transom stitched
- [ ] Bow stitched
- [ ] All remaining structural panels stitched
- [ ] Symmetry verified (beam measurements at 3+ stations)
- [ ] Zip tie tails trimmed
- [ ] Journal entries 4–6 submitted
Phase 2 Grade (Build Quality checkpoint): — Beam Measurements: Port = — | Starboard = — | Difference = —
Phase 3: Framing & Epoxy Seams
Target: October 1, 2026 | Status: Not started
- [ ] All frames fitted and installed
- [ ] All bulkheads installed
- [ ] Frame alignment verified
- [ ] Interior fillets — all panel seams
- [ ] Interior fillets — all frame-to-hull joints
- [ ] Exterior fillets — all chine seams
- [ ] Keel fillet — full length applied
- [ ] All fillets inspected and touched up
- [ ] Journal entries 7–9 submitted
Phase 3 Grade (Build Quality checkpoint): —
Phase 4: Epoxy Sealing & Fiberglass
Target: October 22, 2026 | Status: Not started
- [ ] Interior seal coat 1 — all surfaces
- [ ] Interior seal coat 2 — all surfaces
- [ ] Dry spots addressed
- [ ] Fiberglass cloth — hull bottom interior
- [ ] Fiberglass cloth — bilge/keel interior
- [ ] Fiberglass cloth — transom interior
- [ ] Fiberglass cloth — hull bottom exterior (full coverage)
- [ ] Fiberglass tape — all exterior chine seams
- [ ] Fiberglass cloth — transom exterior
- [ ] All glass work inspected (no dry spots)
- [ ] Rough glass edges sanded
- [ ] Journal entries 10–12 submitted
Phase 4 Grade (Build Quality checkpoint): —
Phase 5: Custom Build-Out
Target: November 12, 2026 | Status: Not started
- [ ] Interior layout marked on hull
- [ ] Storage compartment dividers installed
- [ ] Livewell liner fitted and bonded
- [ ] Livewell plumbing locations marked
- [ ] All storage/livewell wood sealed
- [ ] Casting deck panels cut to fit
- [ ] Deck support cleats installed
- [ ] Casting deck bonded and glassed
- [ ] Rod holders installed (quantity: —)
- [ ] Rod holder backing plates installed
- [ ] Power-Pole bracket installed at transom
- [ ] Trolling motor backer installed at bow
- [ ] Jack plate mount location reinforced
- [ ] All new wood sealed
- [ ] USA-made hardware documented
- [ ] Journal entries 13–15 submitted
Phase 5 Grade (Build Quality checkpoint): — Rod Holders Installed: — of planned —
Phase 6: Finishing
Target: December 10, 2026 | Status: Not started
- [ ] Full hull inspection complete
- [ ] Fairing compound applied and sanded where needed
- [ ] Hull block sanded: 80-grit pass
- [ ] Hull block sanded: 120-grit pass
- [ ] Hull block sanded: 180-grit pass
- [ ] Edges and corners hand-sanded
- [ ] Hull washed and dried
- [ ] Marine primer applied — full hull
- [ ] Primed surface inspected; defects addressed
- [ ] Topcoat — base color applied
- [ ] Topcoat — secondary USA theme colors applied
- [ ] Non-skid applied to all walking surfaces
- [ ] Final inspection and touch-up complete
- [ ] Masking removed
- [ ] Guest signatures on transom interior documented
- [ ] Final build photo set complete
- [ ] Journal entry 18 submitted
- [ ] Final report submitted
Phase 6 Grade (Build Quality checkpoint): —
Final Report Status
| Section | Status | Notes |
|---|---|---|
| Introduction | Not started | |
| SMART Goal | Not started | |
| Project Overview | Not started | |
| Materials & Equipment | Not started | |
| Build Planning | Not started | |
| Build Process Log — Phase 1 | Not started | |
| Build Process Log — Phase 2 | Not started | |
| Build Process Log — Phase 3 | Not started | |
| Build Process Log — Phase 4 | Not started | |
| Build Process Log — Phase 5 | Not started | |
| Build Process Log — Phase 6 | Not started | |
| Guest Participation Log | Not started | |
| Challenges & Problem Solving | Not started | |
| Skills Gained | Not started | |
| Results | Not started | |
| Analysis | Not started | |
| Conclusion | Not started | |
| Future Plans | Not started |
Summary Grade (to be filled by Academic Supervisor)
| Category | Weight | Score | Weighted Score |
|---|---|---|---|
| Build Quality & Craftsmanship | 40% | — | — |
| Weekly Journal Documentation | 20% | — | — |
| Final Report | 20% | — | — |
| Photo Documentation | 10% | — | — |
| Guest Task Leadership | 10% | — | — |
| Total | 100% | — |
Final Grade: — Credit Awarded: — / 0.5 elective